beta
(영문) 서울행정법원 2019.08.23 2018구합70882

입찰참가자격제한처분취소

Text

1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. Details of the disposition;

(a) The total amount of 1:00 on March 15, 2017, 201:30 on March 15, 2017;

2. Matters referred to the tender;

6.The basic price for the determination of the estimated price shall be posted on the comprehensive national electronic procurement unit prior to the closing date of bid registration, and the estimated price shall be the estimated price, if two preliminary price numbers from among the 15 multiple preliminary prices drawn up within the limit of 3% of the basic preliminary price are selected, the average of four preliminary prices from among the selected preliminary prices shall be determined in the order of multiple choice numbers.

9. Other matters.

(a) A participant shall be aware of all necessary matters and participate in the bidding, such as the detailed specifications and drawings, specifications, specifications, specifications, specifications, bidding oil, goods purchase (manufacture), general terms and conditions of a contract for goods purchase (manufacture), special terms and conditions of a contract, integrity contract performance pledges, special attentions to the national defense electronic procurement system, and the detailed criteria for the performance of the contract for the purchase of goods among small and medium-sized venture products, No. 2016-18 of the notification of the Small and Medium Business Administration, and the detailed criteria for the performance of the contract for the purchase of goods among small and medium-sized venture products, and shall be responsible for the failure to meet.

(f) In the light of the characteristics of munitions, some items are time for participation in the tender after confirming whether they are able to perform the contract with the items for exclusive supply of specific enterprises, and only items manufactured before the tender are submitted, and where there are special circumstances, such as computerized difficulties, the contracting officer may extend the date and time of opening the tender, cancel the tender, or take necessary measures, such as re-public notice bidding.

(i) The person selected as a successful tenderer shall conclude a contract within ten days, request specifications and samples within ten working days, and complete the delivery within the contract payment period;

(l)the method of verifying additional information on items (a sample, specification, drawings, specifications, specifications, etc.) and contact information 1) technical data (a specification, drawings, and contact details);