(영문) 대전고등법원 2016.01.13 2015나11135

수분양자지위부존재확인

Text

1. The plaintiff's appeal is dismissed.

2. The costs of appeal shall be borne by the Plaintiff.

Purport of claim and appeal

The first instance court.

Reasons

1. Basic facts

A. Re-security oil Co., Ltd. (hereinafter “re-security oil”) is an executor of the business of constructing and selling a building C (hereinafter “instant building”) on the land outside Dong-gu, Nam-gu, and five parcels on the land (hereinafter “instant building”). On March 28, 2003, the Plaintiff was awarded a contract for the construction of the instant building among the instant projects, which was contracted from the re-security oil.

B. 1) The Defendant: (a) among the instant buildings, KRW 104 square meters (305.22, 28.20 square meters); (b) 105 square meters (area 95.42, 8.81 square meters); (b) 106 square meters (area 86.38 square meters, site area 7.98 square meters); (c) 107 square meters (area 116.13 square meters, site area 10.73 square meters); (d) 419 (area 15.99 square meters, site area 10.94 square meters; and (e) the total amount of KRW 1060, 205 square meters and KRW 40; (e) 206, 306, 419 square meters; (e) 106, 20420, 306, 416, 20420, 406, 2064.

13,293,00 6,647,00 19,940.