A defendant shall be punished by imprisonment for not less than one year and six months.

As seized gallon lusium 5 smartphone (F), galgal lusium 3 smartphone (G), one unit.

Reasons

Punishment of the crime

1. The Defendant violated the Oil Pipeline Safety Control Act was in charge of: (a) the Defendant: (b) the role of: (c) the Defendant, the J, the K (each of the detention charges on December 3, 2014); (d) the Defendant, the prosecution of detention on February 5, 2014; and (e) the taking-over of petroleum in the oil pipelines; (b) the role of the Defendant in charge of the commission of the commission of the commission of the commission of the crime, such as taking-over of experts, funds; (c) the selection of oil stations near the oil pipelines in his name; and (d) the role of the Defendant, theO, etc. to provide funds and excavate underground tunnels from the oil stations to the oil pipelines; and (e) the role of the Defendant and K, etc. to install facilities to steals oil pipelines; and (e) the N and K, etc. to perform the work of installing facilities to steal oil pipelines.

Under the above plan, M around December 2012, around the place where the dopco is laid underground, leased “ Q” in its own name, and J et al. prepared all necessary equipment, etc.

Before that end, from around February 2013, the Defendant, J, andO excavated underground tunnels to the pipelines managed by the victim company that was laid underground 2 meters away from the above boiler room up to 13.1 meters underground. N et al., an engineer of the Republic of Korea, installed an oil stamp to steal oil by drilling the hole on the pipelines, and connected it to the oil tank underground of the oil station through the oil pressure tank.

Accordingly, the Defendant, in collusion with J et al., installed facilities to steal oil on oil pipelines.

2. The Defendant, along with the above J, excavated underground tunnels from the oil station to the oil pipelines in order to steal petroleum in the oil pipelines managed by the victim dopco laid underground in the above Q Q in the same manner as described in paragraph 1 between December 2012 and February 2013: