(영문) 서울행정법원 2014.06.03 2013구합52537

입찰참가자격제한처분취소

Text

1. The Defendant’s disposition of restricting participation in bidding by unjust enterprisers against the Plaintiff on February 27, 2013 is revoked.

2...

Reasons

1. Details of the disposition;

A. The Plaintiff is a corporation whose purpose is reinforced concrete construction business, window construction business, building assembly business, etc.

B. On November 22, 2012, the Defendant issued a public announcement of the purchase of the “Aluminium head and sculs” at the Korea Occupational Safety and Health Agency (hereinafter “instant product”) to the Korea Occupational Safety and Health Agency (hereinafter “instant public announcement”), and the main contents are as follows.

1. The contract method of the Korea Occupational Safety and Health Agency: The item of limited competition: The quantity and unit price of metal production: the date and time of bidding (total amount): the supply period of 13:00 on December 4, 2012: May 31, 2013: The estimated price: the number of bidding prices of 1,154,545,45 won (excluding value-added tax): The number of bidding prices of 1,154,545 won (excluding value-added tax): The method of selecting successful bidder in an electronic bidding: The method of selecting successful bidder in an electronic bidding: The evaluation of the ability to perform the functions of competing products during the mid-term period (public announcement of the Public Procurement Service - the estimated price of 1 billion won or more): The price included in the basic amount, the price of value-added tax;

2. The detailed description, quantity, and the detailed description, details, and detailed specifications of the purchase shall be referred to as the attached specifications, etc., and the detailed specifications of the purchase shall be referred to as the time to inquire the person in charge of the demanding administrative agency about the specifications and detailed specifications;

3.The other matters will be determined at the arithmetic mean of the 15 preliminary prices by drawing four of the 15 preliminary prices, and the basic amount for the calculation of the preliminary prices will be disclosed to the National Integrated Electronic Procurement System (htp:/www.g2b.go.r) no later than seven to three days before the date of the tender.

C. As a result, the 20 companies, including the Plaintiff, participated in the said bidding, and the remaining 19 companies, other than the Plaintiff, do not meet the successful bid line, the Plaintiff who participated in the said bidding at KRW 1,079,849,000, was selected as a successful bidder. As to the metal creation 1,000, among the Defendant on December 13, 2012, the Plaintiff was selected as a successful bidder.