beta
(영문) 전주지방법원 2018.02.14 2016구합2035

이주대책대상자제외처분취소 청구의 소

Text

1. The Defendant’s disposition to exclude the Plaintiffs from those subject to relocation measures on August 30, 2016 is revoked.

2. The costs of lawsuit shall be.

Reasons

1. Details of the disposition;

A. 1) The Ministry of National Defense’s progress of the instant project 1) The Army E located within the jurisdiction of the Defendant (hereinafter “instant E”) from before 2012.

2) The transfer project (hereinafter referred to as the “instant project”)

(2) On February 4, 2015, in relation to the instant project, the following had been discussed, and news reports were made on the same day on the same day. However, in relation to the instant project, it was intended to transfer it to the former, but did not transfer it to the latter, the latter and the local residents.

In the Jeonju-si, I asked to review the “Fdong in Jeonju-si” and “Griju-gun in Jeonju-si” as a candidate to transfer the instant E to the Ministry of National Defense.

Accordingly, the Ministry of National Defense examines the operational nature of the above two areas.

The Jeonju-si received the results of the above operational review from the Ministry of National Defense, and then finally one place including the former North Korean office, which was the originally planned site for relocation, is a plan for the selection of the relocation site and consultation with the Ministry of National Defense.

However, there is a high possibility that one of the above two areas may be decided as the relocation site in the opposition of the Gun and the Gun in the North Korean Office.

Jeonju is a plan to determine the previous site by March 2015.

3) On March 3, 2015, the Ministry of National Defense and the Defendant decided the Geumcheon-gu Seoul Special Metropolitan City Fdong as the subject of the transfer of the instant E. On September 7, 2015, the Defendant announced the compensation plan for the instant business on September 7, 2015. (4) The Minister of National Defense announced the approval of the instant business plan, which includes the following, as H of the Ministry of National Defense’s announcement, on October 30, 2015:

1. Name of the business: The relocation business of this case;

2. The project to move this case E as a result of the implementation of the urban development project for the Northwest-si, the outline of the project;

(a) Location: The Fran-dong, Seoul Special Metropolitan City (153 parcel; hereinafter referred to as the “instant project site”);

(b) Area: 297,190 square meters;

5. Project operator and its address;

(a) Name: The defendant;

B. The Defendant’s F Village.