beta
(영문) 서울고등법원 2015.06.10 2014나2026789

물품대금 등

Text

1. The plaintiff's appeal is all dismissed.

2. The costs of appeal shall be borne by the Plaintiff.

Purport of claim and appeal

1..

Reasons

1. Facts of recognition;

A. On November 13, 2012, the Plaintiff entered into a contract with the Defendant for the purchase of procurement commodities (hereinafter “instant contract”) with the content that the Plaintiff would supply the Defendant with the contract amounting to KRW 547,672,00, military units headquarters of the demanding administrative agency, the inspection and inspection agency’s Navy headquarters, and the delivery deadline as of December 20, 2012, as indicated in the attached Table 1 list (hereinafter “instant contract”).

The equipment of this case is designed to safely handle explosives by ensuring that the Navy and the Navy's explosive treatment team (EOD) can analyze and read images obtained by dumping the inside of the explosives with X-ray, and consists of X-ray shooting equipment, Nowon-gu, and sagners.

Among them, X-ray shooting equipment is intended to photograph the inside of explosives by hanging X-ray to the suspected objects of explosives, and stampers are intended to realize the images obtained through X-ray shooting through cans and to analyze and read the images realized through cans.

(2) Of the components of the instant equipment that the Plaintiff intended to supply, XR-150 (the name of XR-150) is the product of a pel engineering company in the United States, the consortium is the product of ELE Co., Ltd. (4 vehicles) and the Korea Lepis Limited Co., Ltd. (1 vehicles), and the X-ray system is the product of the U.S. PapA.

There are other components such as fluor, portable fluor (PDA).

(3) The main contents of the general terms and conditions of the purchase of goods (manufacture) contract (hereinafter “general terms and conditions of the contract”) and the special terms and conditions of the quality control of the purchase contract (hereinafter “special terms and conditions of the contract”) that include the terms and conditions of the instant supply contract are as shown in attached Form 2

(b) Failure rulings and joint meetings (1) January 2, 2013 and 1.