공사대금 등
1. The Defendant shall pay to the Plaintiff KRW 92,00,000 and the interest rate of KRW 15% per annum from June 8, 2017 to the day of complete payment.
1. Basic facts
A. The Plaintiff is an individual entrepreneur who runs a construction business, such as steel frame, under the trade name of “C”.
B. As indicated in the following table, the Defendant subcontracted the construction of a factory to the Plaintiff by being awarded a contract with the building owner, and the Plaintiff completed all of the above construction works.
(2) Each of the instant construction works shall be referred to as “each of the instant construction works.” Serially referred to as “D construction works,” “E construction,” and “F construction works.” The GJ’s first floor neighborhood living facilities from April 1, 2014 to July 1, 2014, at Ansan-si, on November 7, 2014, the purpose of the appraisal of the first floor neighborhood living facilities on the first floor above the ground, at Ansan-si on November 2, 2014; the purpose of the appraisal of the first floor above the first floor; the purpose of the appraisal of the first floor above the first floor; the purpose of the appraisal of the first floor above the second floor above the ground; the purpose of the appraisal of the first floor above the second floor above the G L on July 2, 2014 to February 3, 2015; and the purport of the appraisal of the first floor above the second floor above the ground (O evidence 2016-17.217).
2. Summary of the parties' arguments
A. Although the contract for each of the instant construction works asserted by the Plaintiff was not prepared, the Defendant is obligated to pay the Plaintiff the unpaid construction cost as indicated below, as it is written in advance by calculating the unit price per square meter.
D Corporation 1D Corporation 105,00,000 won 90,000,000 won 15,000,0000 won 2 E Corporation 180,000,000 won 51,000,000 won 304,000,000 won 278,000 won 278,000,000 won total of KRW 26,00,000 won 26,000,000 won for construction project
B. Defendant’s assertion ① concluded each of the instant construction contracts with O, the husband of the Plaintiff, who is not the Plaintiff, verbally, and thus, the instant lawsuit is unlawful as it was filed by a person who is not a party standing.
(2) TheO and the defendant shall conclude each of the instant construction contracts verbally.