beta
(영문) 부산지방법원 동부지원 2012.10.08 2012고단2099

업무상과실치사등

Text

Defendant

A A Fines 2,00,000 won, Defendant B’s fine 6,000,000 won, Defendant C’s imprisonment without prison labor for one year, and Defendant C.

Reasons

Punishment of the crime

Defendant

A As the head of the building of Defendant E Company, Defendant E Company is a person in charge of safety control who supervises and supervises the Busan apartment reconstruction work contracted by the Ministry of National Defense, and Defendant B is the head of the field office in charge of the management and supervision of the above civil engineering work among the above reconstruction work from Defendant E Company as the vice head of the Ministry of National Defense. Defendant C is a person in charge of the installation and dismantling of “a retaining wall” in accordance with Defendant D’s instructions (work method, work order, work schedule). Defendant C is a person in charge of the installation and dismantling of “a retaining wall” in accordance with the above construction work, and the victim L (64 years of age) for the above construction work (However, this construction and dismantling work of Defendant D Company is the directly operated part of the construction work of Defendant D Company, and the victim is belonging to Defendant D Company’s daily work from August 19, 201 to December 30, 2011, and Defendant C 15, the 2015th of the above construction work, Defendant C’s 15th of the Han beam.

The above work is to extract the sn beam beam from the retaining wall using the sn beamline, and if the victim connects the sn beam line between the sn beam and the sn beam and transmits the signal, the sn beam engineer is to extract the sn beam. At the time Hn beam is installed between the retaining wall and the sn beam. At the time, the sn beam is to return the sn beam to the original state by gathering the sn beam from the upper part of the underground structure, such as the sn beam and the surrounding the underground structure.