beta
(영문) 대구지방법원 2018.04.11 2017나313309 (1)

추심금

Text

1. The plaintiff (appointed party)'s appeal is dismissed.

2. The costs of appeal shall be borne by the Plaintiff (Appointed Party).

Reasons

1. The reasoning for this part of this Court is that the corresponding part of the judgment of the court of first instance is identical to that of the corresponding part of the judgment, and thus, this part is cited in accordance with the main sentence of Article 4

2. According to the facts of the judgment as to the cause of the claim, the third debtor, barring any special circumstance, is obligated to pay 3,894,891 won and 31,460,000 won among them, 24,339,335 won and 22,50,000 won among them, 33,961,00 won and 31,298,416 won among them, 2,914,937 won and 2,486,317 won among them, 2,486,317 won and 2,486,94,942 won, and 5,50,000 won to the designated creditor D, and 31,298,416,937 won to the designated creditor E, and 2,486,317 won among them, and 2,486,942 won and delay damages for delay to the designated creditor.

3. Judgment on the defendant's defense

A. Defendant’s assertion 1) The instant electric power plant, which gave up the claim of I, has significant defects, such as a decrease in the power generation efficiency due to a mistake in the construction process, and I and the Plaintiff renounced the Plaintiff’s right to claim the construction cost, etc. against the Defendant, and the Plaintiff’s right to claim the repair of defects. 2) The instant lawsuit, the extinctive prescription period of which, on August 7, 2009 when the instant construction was completed, was filed on December 24, 2015, which was three years after the expiration of the extinctive prescription period, from August 7, 2009 when the instant construction was completed. Accordingly, the extinctive prescription period of the claim of the Defendant for the construction

3 The offset defense I guaranteed that when the instant power plant is installed as the “salivation track for slope reduction,” the average of 4.5 hours per day will be more than 4.5 hours. The average of 1-day generation hours from August 2009 to March 201 of the instant power plant is less than 3.71 hours, and it is substantially short of 4.38 hours per day average of 1-day generation hours of the solar power plant of the same method adjacent to the instant power plant.

This is the voltage of the eS-190 light-based sun-lights installed in the power plant of this case, and the light phenomenon occurs due to the corrosion of the non-fold knowledge servers.