손해배상(기)
1. The Plaintiff:
A. The Defendant Republic of Korea and B shall jointly and severally engage in KRW 17,862,954 and the aforementioned amount. < Amended by Presidential Decree No. 27505, Sep. 1, 2016>
1. Basic facts
A. (1) The Plaintiff has raised Korea-style cattle in a stable located in Gyeongbuk-gun E (hereinafter “instant stable”) from December 2009.
(2) Defendant Republic of Korea is the ordering place of the construction of the H National Highway (hereinafter “instant road”) leading to Gyeong-gun F through G, and Defendant B (hereinafter “Defendant B”) is the starting place of the instant road construction. Defendant Sung-gun is the ordering place of the instant waterworks construction (hereinafter “instant waterworks construction”) and Defendant C Co., Ltd (hereinafter “Defendant C”) is the subcontractor of the instant waterworks construction, and Defendant C Co., Ltd is the subcontractor of the instant waterworks construction (hereinafter “Defendant D”).
(3) The instant stable is located at a point of approximately 120 meters south from the site of the instant road works, and approximately 20 meters south from the site of the instant water works, and its location map is as follows.
B. (1) Construction progress in the vicinity of the instant stable - Total construction period: (a) From October 12, 201 to September 4, 2018 - Section adjacent to the instant stable : (b) around August 12, 2015 to June 18, 2016; (c) noise, such as the minimum separation distance of main equipment during the construction period (dB) around January 2018 to May 2018; (d) the maximum noise level from 0.6 to 0.6 August 6, 2015 to 19 August 19, 2015; and (d) Defendant 6: (a) the installation of the instant road works from 1053-638-68-68-68-68-16, 2016-16, 2000 square meters away from the first construction period.