beta
(영문) 수원지방법원 평택지원 2018.10.05 2017고합2 (1)

특정경제범죄가중처벌등에관한법률위반(공갈)등

Text

A defendant shall be punished by imprisonment for not less than one year and six months.

Reasons

Punishment of the crime

[criminal records] On July 18, 201, the Defendant was sentenced to imprisonment with prison labor for a violation of the Punishment of Violences, etc. Act (Composition and Activity of Organizations, etc.) at the Suwon District Court House on the grounds of the violation of the Punishment of Violences, etc. Act (Composition and Activity of Organizations, etc.) and completed the execution of the sentence at the Ansan Prison on July 17, 2012.

[2] Criminal facts B are the chairpersons of the “C” (hereinafter “C”), and the Defendant is CD Division E, and F is the Chairperson of CD and C; CD and C; CD and C; CD and K-C-C-Chairperson; C-C-Chairperson and K-C-Chairperson; H is the N general affairs of C-C-affiliated organization; C-C-affiliated P P-Chairperson and Q are the general affairs of R-C-affiliated organization; S is engaged in the business of leasing construction equipment in the construction site in the dispatching coal area; and C is the chairperson comprised of the lessor of construction equipment in the dispatching coal area for the purpose of acquiring the right to lease equipment in the construction site in the dispatching coal area; C is the former affairs of the “V-based corporation,” which belongs to “T; W is the general affairs of “T; and C-X operator,” who belongs to “T-based.”

B From February 2012, the “Z” operated the “Z” which performs civil engineering works in Pyeongtaek-si. From around September 2012, while operating “AA” in which human resources were supplied at the same place, from around the same day, in Pyeongtaek-si on January 8, 2013, B, together with a construction equipment leasing company, human resources supply company, etc., which was based on the Pyeongtaek-si basin in front of the office of the Korea Land and Housing Corporation in Pyeongtaek-si branch in Pyeongtaek-gu, in order to hold a meeting with “the participation of the local enterprise in the development project,” and attempted to receive pictures in his/her hand, with the formation of a public opinion in each of the following subparagraphs with B from the local society.

B around December 2013, the purpose of B is to “to ensure that “the construction site of the ordinary housing site can work only with a usual buyer and a company” and “to preferentially lease and employ station equipment in the AB district, construction, and construction work site, and station personnel in the ordinary housing site, and to acquire the right to supply construction materials and food materials.”