beta
(영문) 서울고등법원 2015.11.05 2014누6588

시정명령등취소

Text

1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. Basic facts and circumstances of dispositions;

A. As of the status and status of the Plaintiff, etc., the name of the Plaintiff, etc. was changed to the Plaintiff, GaS Construction Co., Ltd., Dongdong Engineering Co., Ltd., Korea Development Co., Ltd., Korea Development Co., Ltd., and in individual case, the name of the company was changed to the Plaintiff, GaS Construction, Dongbu Construction, Dongbu Construction, Gabu Construction, Gabu Industrial Development, Galoba Construction, Galoba Construction, Galoba Construction, Galoba Construction, and Daloba Construction. However, as at the time of the tender of the instant construction, the Plaintiff was a Columbul Construction Co., Ltd., Ltd., at the time of the tender of the instant construction, and thus, the indication of the company is omitted even for the other companies than the Plaintiff, and all companies are engaged in the construction business.

B. The term “facilities installed in the Green Center in the Kimpo-han City Green Center” refers to “a highly advanced waste incineration and food resource recycling facilities that recover and reuse energy generated during the operation of incineration facilities while sanitary and stable treatment of household wastes, food, wastes, etc. is conducted.”

The outline of the construction project: (a) the public announcement of the tender for the construction project (hereinafter referred to as the "tender for the construction project") and the tender for the construction project for the facilities of the Green Center (hereinafter referred to as "the tender for the construction project for the Magpo-si") in Namyang-si: (b) the outline of the construction project and the tender procedures for the construction project for the Kimpo-si: (c) the construction project for the construction project for the construction project

() The construction budget: 67,272,00,000 won (including value-added tax): 84 tons/days (42 tons x 2) of incineration facilities, 40 tons/days (20 tons x 20) of food resources-making facilities: 28 months from the commencement date of construction work (three months from the start date of comprehensive trial operation period: The design period of the construction site development project in the Kimpo River site development project zone: the basic design is the person eligible for the working design for 70 days from the site site date.