장해등급결정처분취소
1. The plaintiff's claim is dismissed.
2. The costs of lawsuit shall be borne by the Plaintiff.
1. Details of the disposition;
(a) On February 4, 2015, the Plaintiff, which had been working at the construction site of Geumcheon Construction Co., Ltd., was coming to fall at the construction site of the said construction site on or before the implementation, obtained approval from the Plaintiff on February 4, 2015, on the ground that the Plaintiff obtained approval on the ground that the Plaintiff felled from the said construction site No. 11, 12 crossings, No. 1, 1, 8, 1, 8, 1, 4, 8, 1, 1, 1, 1, 1, 3, 6, 1, 2, 3, 6, 1, 5, 5, 5, 5, 5, 5, 5, 5, 5, 5, 1, 5, 1, 5, 1, 5, 5, 5, 1, 5, 1, 5, 5, 1, 5, 5, 1, 5, 5, 1., 5.
B. After having received treatment as above, the Plaintiff filed a claim for disability benefits with the Defendant by asserting that the physical disability of the left-hand class, the sports function disorder of the Heeng, the left-hand knee-hand knee-free knee-free kne-free kne-free kne-free kne-free kne-free. On August 1, 2016, the Defendant rendered a disposition that the Plaintiff’s disability grade constituted class 9 (hereinafter “
Bridges: Class 9 (Application Mutatis Mutandis to the left-hand knee of the top-hand knee: Restriction on the movement of Class 14 (No. 1 among the three sections of a single bridge), the left-hand knee of Class 10 (A left-hand knee of a single bridge) (Article 10-14) (Article 10-10 (Article 10 (Article 14 of a single bridge), No. 14): Mediation of Class 9 (Article 14-10 of a single bridge)
2. Whether the instant disposition is lawful
A. The degree of physical disability in the exercise function of the Plaintiff’s claim to the left-hand interests of the Plaintiff is more than 3/4 of the exerciseable area.