단말기 인수 및 장착확인서 이행
1. All of the plaintiffs' claims are dismissed.
2. The costs of lawsuit are assessed against the plaintiffs.
1. Basic facts
A. The defendant is a non-corporate body comprised of E among private taxi business entities in Daegu area, and the plaintiffs are members belonging to the defendant.
B. On February 3, 2011, the Defendant entered into a lease guarantee contract with H to build the Daegu-gu Jeju-si District District Call System (hereinafter “G”), which operates the G Chungcheong Station located in the Daegu-gu (hereinafter “G”), and the specific details are as follows.
A: Defendant B: Article 2 (Terms and Conditions of Installment of Terminal and Unit Price) G 1 purbur MT terminal
1. The term "seven man method (including a credit card, transportation card terminal, data communication cap method);
2. The term “digital meter” means a unit price installment (VAT Map/unit price 2) unit price per unit purchased in bulk from B;
1. Terminal: 700,000 won;
2. Interest-free interest rate for 36 months;
3. Article 3 (Joint and Several sureties and Obligations of KT derivativeel) of the total purchase volume per 1,030.
1. Eul shall pay to the company the amount of 1,030 installment for the MPT equipment of the KTPP (ju) during the contract period.
4. Eul shall provide A with monitors and offices (including water and electricity taxes) of 80 performance rating by law and of 40 to 50 square meters by law.
5. B shall set aside a discount of 50 won per liter when each member in the ELP World War injects gas to the members of the D members, and return it to the D members.
6. Mutual consultations shall be held by giving preferential treatment to reserve funds when injecting the amount significantly higher than the amount of each of the members D.
Provided, That if a D member fails to injecting 400 liters, the D member shall compensate for the penalty as much as the amount of injecting to G.
7.B shall bear the expenses of transfer per existing D Law, 30,000,000 won ( 30,000,000)
8. After the commencement of the business under contract with Gap and Eul, Eul shall select the filling station in the Seo-gu and Seo-gu and shall endeavor to cause inconvenience to D members.
(D) Members shall cooperate to the maximum amount of charging; 10. The ownership of the KTMT terminal and digital meters is the assets of B.