beta
(영문) 수원지방법원 2017.07.20 2015가단113954

손해배상(건)

Text

1. The Defendant’s KRW 6,849,018 as well as the Plaintiff’s annual rate of 5% from June 24, 2015 to July 20, 2017, and the following.

Reasons

1. In full view of the fact that there is no dispute over the basic facts, and the purport of the entire pleadings as to the statements in Gap evidence Nos. 1 and 2, the plaintiff concluded a contract with the defendant on September 2013, 201 to determine the construction cost of the 272,00,000 won for the construction work of the ground B-based detached housing (hereinafter “construction work in this case”) as the construction cost (excluding value-added tax).

2. Determination

A. Since the Plaintiff’s assertion was not constructed or defective in the construction work of this case executed by the Defendant, the Defendant should pay the Plaintiff damages amounting to KRW 18,866,487 and interest for delay.

(b) Judgment 1) In light of the facts without dispute, Gap 3 through 18 evidence (including a number of 1), the appraiser C’s appraisal and supplementary response, and the overall purport of pleadings, the following facts may be recognized. The cost of generating 1st floor dives of dives of 26,510 won, the cost of generating 53,021 dives of 2nd floor, the cost of repairing 184,193 won for 184,194, the cost of repairing 2,194, the cost of constructing 16th floor of 3th floor, the cost of repairing 5th floor of 16th floor, the cost of repairing 5th floor, the cost of removing 16th floor of 3th floor of 4th floor, the cost of repairing 5th floor, the cost of removing 16th floor of 3th floor of 4th floor, the cost of installing 16th floor of 2th floor of 2th floor of 2, the cost of 16th 3th floor of 5th floor.