손해배상(기)
Defendant D shall pay to each of the Plaintiffs KRW 253,052,035 as well as 5% per annum from December 1, 2018 to November 24, 2020, and November 20, 202. < Amended by Presidential Decree No. 25350, Nov. 1, 2020>
1. Basic facts
A. The Defendant Limited Company C (hereinafter “Defendant Company”) is the owner of the fourth floor building E on the ground (hereinafter “instant building”) in leisure time, and Defendant D was a person who leased the instant building from the Defendant Company and carried out accommodation business in the name of “F” around August 16, 2018.
The Plaintiffs are parents of the network H (hereinafter “the deceased”) that died from a fire that occurred in the instant building G.
B. On December 1, 2018, the Deceased and the deceased I were accommodated in the instant building G heading (hereinafter “instant guest rooms”) around December 21, 2018.
On December 1, 2018, at around 22:50, a fire (hereinafter “instant fire”) occurred in the guest room of this case. As a result, the Deceased and the deceased died on December 1, 2018.
C. At the time of the occurrence of the instant fire, employees J and K were serving in the instant building.
J around December 1, 2018, around 22:54, the fire alarm system installed in the corridor of the second floor of the building in this case is sounding, and the fire alarm system is moving from the second floor of the building in this case to the second floor of the 2nd floor of the 2nd floor of the 2nd floor of the 119 report.
On the other hand, K followed the door of the guest room of this case to the deceased and the deceased I, and attempted to extinguish fire using fire extinguishing devices, and evacuate other guests from the guest room.
The following are the results of the investigation conducted by the leisure fire station on the instant fire.
The part of the bend floor, which can be seen as the point of fire prevention and combustion, was destroyed by the 4th square of the floor due to the storm of the ceiling, etc. However, the gas was collected for the 2nd floor of the bend, but it was confirmed that the colorless liquid did not distinguish the unique matters, and when light was sprinked on the top of the floor, it was confirmed that the oil belts of the 4st square of the floor constructed on the floor, and that the surface of the 4th square of the floor was spacked. Fire-prevention devices or montons, etc. are not observed.