건물등철거
1. The Plaintiff: 3,695 square meters of F forest land in Seodaemun-gu Seoul Metropolitan Government;
A. Defendant B shall mark 1, 2, 3, 4, 11, 12, 13, 14.
Comprehensively taking account of the purport of the argument in Gap evidence 1, Eul evidence 2-1, Eul evidence 3-2, and Eul evidence 3-2, the plaintiff completed the registration of ownership transfer with respect to the above 3,695m2 (hereinafter "the forest of this case") on November 18, 201. The defendant Eul owned the above 3m2, Eul evidence 4-2, Eul evidence 3-2, Eul evidence 4, and the above 3m2 and the above 3m2 (the above 3m2, connected to the above 40m2, Eul evidence 3-2, connected with each of the above 3m2, Eul evidence 3-2, Eul evidence 44, and the above 3m2, connected with the above 4m2, Eul evidence 4, and the above 3m2, connected with the above 3m2, Eul evidence 2, 24,25,26,15, each of the above 3m2, 300m2.
According to the above facts, among the forest land in this case, Defendant B, among the forest land in this case, removed a cement block structure built on the ship with the indication of the attached drawing in (D), (e) part 80.06 square meters, cement apparatus and splate roof apartment structure, (f) part 26.22 square meters in the same drawing, a cement block structure, cement apparatus and splate roof rooftop building built on the 26.22 square meters in the same drawing, a warehouse built on the part (g) part (g) of the same drawing, and a warehouse built on the 5.64 square meters in the same drawing, and a toilet built on the part (h) part (b) of the same drawing on the 3.24 square meters in the same line with the indication of the attached drawing.