beta
(영문) 서울중앙지방법원 2017.11.24 2017가합514413

소유권보존등기말소 등 청구의 소

Text

1. The plaintiffs' respective claims against the defendants are dismissed in entirety.

2. The costs of lawsuit are assessed against the plaintiffs.

Reasons

1. Basic facts

A. In the Forest Survey Division, which was drafted in around 1913, which was the Japanese colonial era, the title holder of the assessment of the fact-finding land of 37 YY E-gun of Gyeonggi-do (hereinafter “instant assessment land”) is written as F.

B. On the other hand, G, the Plaintiff’s fleet, died on July 1935 and succeeded to G’s property solely. Since H and his wife, I, J, K, and L were considered to have died on July 27, 1958, M, his wife, and M were to have succeeded to H’s property solely. M was to have succeeded to the property solely on June 9, 2003, and M was to have died on September 23, 2014 by N, the husband of M, and jointly succeeded to the property of 1/4 shares of each of the Plaintiffs and O M.

C. On May 8, 1967, the land of this case, which is part of the land of this case, was registered for the preservation of ownership under the name of Q, which was put by Defendant D, under the 8383 receipt of the Mancheon District Court on November 17, 1974, with respect to the above PP 40,463 square meters on the cadastral restoration on May 8, 1967, and the registration of ownership transfer was made under the name of R as of July 6, 1978 by the receipt of the same registry office.

The above P Forest land is divided into 40,463 square meters, and 16,540 square meters of land in Seocheon-gun, Gyeonggi-do on May 4, 1985, and 49 square meters of land in Seocheon-gun, Gyeonggi-do on June 4, 1987, and 40,463 square meters of land in the above P Forest was 23,874 square meters.

(hereinafter the above PP 40,463 square meters, each of which was divided and divided, is 23,874 square meters of the Gyeonggi-do PP Pocheon-gun, Gyeonggi-do (hereinafter “the instant mother land”). E.

The 5,024/23,874 shares in the mother land of this case in the name of R was changed on October 5, 1994 by the Jungcheon District Court's Macheon District Court's receipt of Macheon District Court's registration office on October 5, 1994 (the name of Korea Industrial Development Co., Ltd. was changed on March 26, 2004 to two industry development Co., Ltd., and on March 16, 2007, the name was changed to two industry development Co., Ltd. and the name was changed to two industry development Co., Ltd.; hereinafter "dusan Construction").

F. After that, on February 27, 1996, the land of this case was divided into 15,113 square meters of forest land located in Seocheon-gun, Gyeonggi-do, and the land of this case was 8,761 square meters of land. The land of this case became 8,761 square meters of land.