beta
(영문) 청주지방법원 2016.01.28 2015가단106363

시설물철거 및 토지인도

Text

1. The defendant

(a) Of the lands listed in paragraph 1 of the attached list, the annexed sheet Nos. 4, 5, 6, 7, 8, 9, 10, 97, 98, 1, 1, and 1.

Reasons

1. Determination as to the cause of claim

A. The Plaintiff is the owner of each of the lands listed in the separate sheet Nos. 1 and 2 (hereinafter collectively referred to as “each of the instant lands”), and the Defendant is a person who operates a golf practice range and a D golf course (hereinafter referred to as “instant golf course”) on the ground outside C and six neighboring lots.

The defendant of this case among each of the lands of this case 1-A of the above disposition.

The part of “A” as indicated in the port is 80 square meters and 1-B of the disposition.

The part of “B” as indicated in the port is 54 square meters and 1-C of the disposition.

The part of “D” as indicated in the port is 299 square meters and d in Disposition 1.

The part of “ma” as indicated in the port is 12 square meters and 1-E of the disposition.

(f) The part of “b” as indicated in the port is 316 square meters and 109 square meters as the site of the instant golf course, and the sn beam belt is installed and used in the part 133 of the attached Form 133.

[Reasons for Recognition] Facts without dispute, Gap evidence Nos. 1, 2, 3, 4, 10 (including branch numbers for those with serial numbers) and the purport of the whole pleadings

B. In light of the above facts, the Defendant is obligated to remove the green facilities installed in the part of “g” in Article 1-1(f) of the above disposition and the sn beam belt installed in the part of 133 square meters indicated in the attached drawing. The Defendant is obligated to remove the 80 square meters in the part of “A” indicated in Article 1-1(a) of the above disposition, part 54 square meters in the part of “B” indicated in Article 1-1(b) of the above order, part 29 square meters in the part of “B” indicated in Article 1-1(c) of the disposition, part 12 square meters in the part of “Ma”, part 16 square meters in Article 1-1(e) of the above order, part 316 square meters in the part of “ma” in Article 1-1(2) of the above disposition, and part 90 square meters in the part of “a”, part 290 square meters in the attached drawing, part 94 or 9704 square meters in each part “M” or 97.