(영문) 대전지방법원 2012.09.19 2012구합920

건축허가처분취소

Text

1. On February 13, 2012, the Defendant is on the Daejeon-dong, Daejeon-dong and 140-42, and on two parcels, the Plaintiff.

Reasons

In light of the above circumstances, namely, the concentration of pollutants anticipated to be discharged at the instant facilities not only meet the permissible emission levels, but also the Defendant’s overall consideration of the location of the instant real estate or the concentration of pollutants to be discharged at the instant facilities, and it is determined that the Plaintiff had the permission to install air emission facilities of the instant facilities. In light of the above circumstances, the Defendant’s above disposition ground 2 cannot be a justifiable ground to revoke the instant construction permission.

The facility of this case is subject to the permission to install air emission facilities, and the plaintiff obtained the permission to install air emission facilities as follows.

설치허가 내용 배출시설 방지시설 고형연료제품 사용시설 - 3,950kg/hr * 1 오염물질 발생량 : 421.375톤/년 ◆ 선택적비촉매환원시설 : 4.334㎥/분 * 1 ◆ 반건식반응시설 : 1,670㎥/분 * 1 ◆ 흡착에 의한 시설 : 1,550㎥/분 * 1 ◆ 여과집진시설 : 310㎥/분 * 1 ◆ 흡수에 의한 시설 : 1,340㎥/분 * 1 ◆ 응축에 의한 시설 : 1,200㎥/분 * 1 ㉡ 이 사건 시설에서 배출될 것으로 예상되는 오염물질의 종류, 처리전 농도, 처리효율, 처리후 농도, 배출허용기준은 다음과 같다.

After treating the kinds of pollutants, the concentration concentration of dust CO2 NCO2 HCL 2 HCL Daol 2363mg/S 41.2.120 3do 0.5ng-TE/N 39 0.74% - 99.74% - 63.17% 94.64% - 66.67% 90.00% 6.34m/S 37.00% 6.34m/S 37.9.66.27.27.0 0.05mg/S 200 70 m20 m200 m20 m200 m20 m20 m20.1g-TN/N 30 m20 m20 m20 m20 m20 m3.