(영문) 서울중앙지방법원 2021.01.07 2018가합555053

공사대금

Text

Defendant (Counterclaim Plaintiff) shall pay to the Plaintiff (Counterclaim Defendant) the amount of KRW 116,819,007 and the amount thereof from March 16, 2018.

Reasons

. After obtaining the approval for the use of the instant building upon the initial construction, the purpose was to change the first floor and the first floor and the second, and the third floor from the ground level to the public announcement source, such as the design drawings of the evidence No. 7, and to change the contents of the fourth floor into the residential housing, and to change the fourth floor to the residential housing.

Public mission: Gwanak-gu, Seoul Special Metropolitan City D, and F Contract Details for Construction Work: The date on which the completion date of February 1, 2017 is scheduled: July 30, 2017: KRW 4890,000 per day of the contract amount per July 30, 2017.

8. The commencement of the contract shall be paid to A (the plaintiff) and executed by B (the plaintiff) upon entering into the contract for construction in accordance with the design drawing of the chapter B, in accordance with the terms of the contract for construction.

9. This contract is a contract for construction to enter into this contract with the same content as B after obtaining a construction permit by drawing up a category of documents attached under B's responsibility.

* The Plaintiff entered into a contract for construction work with the Defendant 2-type 3 residential facilities of 149.19 square meters above 15.84 square meters below 165.03 square meters above 168.59 square meters above 165.03 square meters above 165.5 square meters above 2-class 2 residential facilities (private teaching institutes) 139.95 square meters above 139.95 square meters above 2-class 2 residential facilities (multi-type 2 residential facilities) with the Defendant 2-type 2 residential facilities of 39.95 square meters above 13.93 square meters above 13.5 square meters below the ground (multi-class residential facilities) and the total floor area of 15.5 square meters below the 2-class residential facilities of 133.93 square meters above the ground (multi-class residential facilities).

1. A mission: D or F new construction works;

2. Construction site: Gwanak-gu, Seoul Special Metropolitan City D, F

3. Date of commencement: January 11, 201.