(영문) 서울남부지방법원 2014.04.04 2012가합100884

구상금

Text

1. The Defendants are 115,406,546 won to each Plaintiff and 5% per annum from December 14, 2013 to April 4, 2014.

Reasons

1. Basic facts

A. In relation to the parties, etc., the Plaintiff is entitled to the Industrial Accident Compensation Insurance Act (hereinafter “Industrial Accident Insurance Act”).

(2) Defendant A is an insurance company that entered into an insurance contract with Defendant A with respect to the liability for damages arising from the operation of the foregoing medium machine (hereinafter “Defendant Company”).

3) Hyundai Construction Co., Ltd. (hereinafter “Modern Construction”)

) A business owner who has purchased industrial accident compensation insurance under the Industrial Accident Insurance Act and is the victim C (hereinafter referred to as “victim”).

b) The New World Industry (hereinafter “New World Industry”) Co., Ltd. (hereinafter “New World”) was subcontracted with reinforced concrete construction work in Seodaemun-gu Seoul Construction, Seodaemun-gu, Seoul.

On April 11, 2009, a worker of the new world industry, was engaged in the work of building concrete on the underground connections floor between E and 2 employees other than F of working groups belonging to the new world industry, G of working groups belonging to the new world industry, Defendant A, the operator of the mid-term season, and Defendant A, the operator of E and subway No. 2, who is an employee of the new world industry, who is a worker of the new world industry, was faced with an accident that is shocked by the string machine operated by Defendant A on the string machine (equipment used to put concrete into a specific place) for concrete strawer (equipment used to put concrete into a specific place) located from the mid-term season operated by Defendant A.

(hereinafter “instant accident”. 2 At the time of the instant accident, the Defendant: (a) operated the mid-term engine and sent the womer underground from the ground; (b) instructed the Defendant A to set a womer on the ground that G would be off a womer with no electricity; and (c) F would get off a womer from the underground to the womer with no electricity; and (d) if G sent the stop signal, the Defendant A would be at the location of the womer with other workers.