(영문) 인천지방법원 2017.06.21 2015가단167

손해배상

Text

1. The Defendant’s KRW 56,229,199 as well as the Plaintiff’s annual rate from July 2, 2013 to June 21, 2017.

Reasons

1. Occurrence of liability for damages;

A. 1) From April 1, 2009, the Plaintiff was serving as the Defendant’s maintenance engineer. 2) On July 2, 2013, the Plaintiff: (a) around 10:00, at the Defendant’s workplace, left a bus with a small Jack for the maintenance of vehicles; (b) under the bus, the Plaintiff was faced with an accident that covers the Plaintiff (hereinafter “instant accident”) with Jack where the Defendant was doing the maintenance of vehicles while carrying out the maintenance of vehicles at the bus’s workplace.

(3) The plaintiff's testimony of witness C against this shall not be believed in light of the relation between C and the defendant, Gap's evidence Nos. 8 and 9, and 1,2,3,4,4,5-tamper's 1, 2, 4, 5-tamper's tang, and 5-tamper's tamper's tamper's tamper's tamper's tamper's tamper's tamper's tamper's tamper's tamper's tamper's tamper's tamper's tamper's tamper's tamper's tamper's tamper's tamper's tamper's tamper's tamper's tamper's tamper's tamper's tamper's t wel's t

B. According to the above fact of recognition of liability, the defendant is liable for tort since the accident of this case occurred due to negligence, although the defendant should have an appropriate organization so that the plaintiff can safely perform maintenance work and create a maintenance environment.

C. The limitation of liability is limited, however, that the Plaintiff has contributed to the expansion of the damage of this case by using small Jak other than Jak at the time of the accident of this case.

As such, the defendant's liability is limited to 80%.

2. In addition to the scope of compensation for damage, each item of the attached Table of the calculation of damages shall be the same as the corresponding item, and in principle, the period for the convenience of calculation shall be calculated on a monthly basis, but less than the last month and less than KRW 1 shall be discarded.

At the time of the accident, the amount of damages is present.