(영문) 의정부지방법원 2016.08.18 2016고정1118

업무방해

Text

Defendant

A, B, and C shall be punished by each fine of KRW 700,000,000,000,000,000 for each fine of KRW 200,000.

The Defendants are the defendants.

Reasons

Punishment of the crime

Defendants are the H residents of Macheon-si.

In addition, the victim J in Sincheon-si was a fertilizer producer operated by K, and K completed the new factory construction procedure in the name of the above victim company around June 2013 in order to make timber necessary for compost production, etc. public. On the other hand, around April 2014, after obtaining approval for the new factory construction in the near MN timber located by the victim L, which is an son, even around April 2014.

Accordingly, the Defendants were willing to interfere with the construction of a factory of the victims for the reason that the above timber causes damage, such as malodor, due to the public plant.

1. On June 20, 2014, around 08:30 on June 20, 2014, the Defendants jointly committed the crimes of Defendant A and Defendant B: (a) obstructed the road from the access road leading to the new construction site of the factory by the victim J (the State) located in the said I to prevent the passage of construction vehicles, such as ready-mixed vehicles; and (b) prevented them from carrying out concrete-type snowing works.

As a result, the Defendants conspired to interfere with the new construction of factories by the victimJ by force.

2. Joint crimes committed by Defendants A, B, and C

A. On July 31, 2014, around 08:30 on July 31, 2014, Defendants were unable to carry out construction works by blocking roads and blocking them from using the same method as the above 1.

As a result, the Defendants conspired to interfere with the new construction of factories by the victimJ by force.

B. On November 13, 2014, around 08:30 on November 13, 2014, Defendants were unable to carry out construction works by blocking roads and blocking them from using the same method as the above 1.

As a result, the Defendants conspired to interfere with the new construction of factories by the victimJ by force.

(c)

Defendants around June 23, 2015, at the access roads leading to the new construction site of a N timber plant of the victim L in the above M around 08:30, the roads will be obstructed and the construction work will be carried out in the same manner as the above 1.