beta
(영문) 광주지방법원 순천지원 2015.11.06 2014고단996

업무방해등

Text

Defendant

A Imprisonment with prison labor for a year and six months, for a year of imprisonment for a defendant B, for a year of imprisonment for a defendant C, for a period of ten months and for a defendant D.

Reasons

Punishment of the crime

"2014 Highest 996"

1. Defendant A and B represent each “G hotel hotel construction bond group” (hereinafter referred to as “construction bond group”), and Defendant C is the general director of the above construction bond group.

On April 25, 2012, the representatives of 43 construction enterprises, including the Defendants, constituted a construction bond group of 13 billion won (which is estimated by the Defendants) and completed the registration of transfer of ownership in the name of the construction bond group based on trust for the above hotel building.

In addition, around September 27, 2012, Jeju Island entered into a contract on the management of the hotel with H(ju) for a period of three years, and continues the hotel business from that time, while collecting 10 billion won of the claim against H(ju) as profits generated from the above hotel business.

On March 1, 2013, Gwangju District Court rendered a ruling that the above transfer registration of ownership is null and void (the avoidance lawsuit filed by H’s bankruptcy trustee against the above claim group). On February 1, 2014, the main mobilization industry was awarded a successful bid of the above hotel building in the amount of 24.5 billion won.

In addition, if the first claim is deducted from the successful bid price, it is difficult to recover their claim for the construction cost.

After the Defendants forced the hotel expenses to be forced with the members I and J of the Construction Claim Group under the pretext of exercising the right of retention, Defendant C requested the establishment company such as the sn beam beamline with which the trade name is unknown, the board board, etc. to close the entrance.

On February 10, 2014, with I and J around 00:30, the Defendants established a prefabricated-type panel at a height of 3 meters on the first floor and the rear door of the above hotel located in K at Y at Y at Yacheon-si. On February 10, 201, the passage door connecting the second floor of the above hotel and the second floor parking lot of the neighboring building was fastened and melted with the 쇠s, and the entrance door of the hotel is also down.