공작물 철거 등 청구의 소
1. The defendant shall be the plaintiff.
A. Of the 123m2 and 99m2, the annexed drawings 1,2.2.
1. The Defendant, with the indication of the claim, possesses each part of “bb” in the attached Form No. 2, 3, 4, 5, and 2 in the line connecting each point of 14c meters in width on the line connecting each point of 1, 2, and 3 in the attached Form No. 1, 3, 4, 6, and 2 with the indication of the attached Form No. 1, 13 (hereinafter “instant wall”) among the 2, 3, 4, 5, and 2 on the line between the land owned by the Plaintiff and 17 square meters in the line between 1, 2, 5, 6, and 123 square meters in Seoul Special Metropolitan City, Chungcheongnam-do and 19 square meters in the attached Form No. 99 square meters in Seoul Special Metropolitan City (hereinafter “the instant wall”).
Therefore, the defendant is obligated to remove the fence of this case to the plaintiff and deliver the land in possession 1 and 2 to the plaintiff respectively.
2. Applicable provisions of Acts: Article 208 (3) 3 of the Civil Procedure Act (Judgment by public notice);