손해배상(환)
1. The Defendant’s KRW 192,115,00 for the Plaintiff and 5% per annum from November 8, 2018 to September 22, 2020 for this.
1. Basic facts
A. (1) On March 29, 2018, the Plaintiff changed the land category from the Defendant on the Gangseo-gu Seoul Metropolitan Government Miscellaneous land B (the ditch was changed on September 4, 2001).
353 square meters (hereinafter “instant land”)
(2) On July 30, 2002, the Plaintiff acquired 1,322 square meters adjacent to the instant land (hereinafter “C land”) and 991.5/1322 shares of the building adjacent to the instant land, and operated D Co., Ltd. for the purpose of automobile maintenance business, etc. on the ground by August 2018.
3) The location and shape of the instant land and C and adjacent land are as indicated in the cadastral map in annexed Form 1. B. The Plaintiff, in the process of construction of the instant land and C-land with the third underground floor and the 14th floor above ground, was performing the construction of the instant land and C-, and the F (hereinafter “F”).
(2) The sum of the construction waste and waste soil buried on the ground of the instant land during the process of removal of the existing building (hereinafter referred to as “the instant waste”).
(C) The Plaintiff, a foundation, requested G to analyze the ingredient of the instant land, and received the soil contamination on November 7, 2018.
2) On November 18, 2018, the head of Gangseo-gu Seoul Metropolitan Government indicated on the Plaintiff whether the contaminated soil of the instant land was contaminated due to the detailed survey (i.e., an Arabic, TPH TH Tyro caron, and the total hydrocarbon oil, among the samples contaminated by the contaminated oil, light oil, traw, and mitc oil.
(3) The Plaintiff requested H (hereinafter “H”) to conduct a detailed soil survey on the land of this case and 14 points and 87 points of land of this case, as shown in the annexed Form 2, H collected groundwater samples at the point of GW-1, GW-2, and attached Form 3, and collected groundwater samples at the point of GW-1, GW-2, as shown in the annexed Form 3, to the extent expected to be purified, as the whole contaminated area (excluding overlapping sections) is 74 square meters and contaminated soil.