beta
(영문) 제주지방법원 2012.05.14 2012고단137

업무방해등

Text

Defendant

A Imprisonment for four months and fines for 50,000 won, each of the defendants B, C, D, and E shall be punished by a fine for 50,000 won.

Reasons

Punishment of the crime

1. The sole criminal conduct interfering with Defendant A’s business;

A. On January 16, 2012, around 12:40, at the first section of the construction site of the construction site of the civil-military complex tourist port at Seopo-si, Seopo-si, Seopopodong, the head of H’s quality control team, a subcontractor of G, was carrying out the work of manufacturing blocks and transporting bits, and the 5 ready-mixed vehicles, such as K and L, a concrete supplier company, attempted to enter the construction site through the main entrance at the construction site. At the construction site, the N and O ready-mixed vehicles belonging to M were supplied with ready-mixeds, and were trying to go out of the construction site for a clerical error.

At this time, the Defendant was seated at the main entrance of the construction site and prevented the above vehicles from proceeding.

B. On January 16, 2012, the Defendant, at the same place on the same date: (a) around 12:45, at the same time; (b) even if police officers were to move the vehicle to another place on the part of the Defendant, prior to that time, the Defendant again obstructed Jeju-P and Q vehicles seeking to enter the said construction site from 12:50 on the same day, leaving the main entrance door and fat.

C. On January 16, 2012, the Defendant: (a) at the same place on January 16, 2012, at three construction vehicles, such as R, S, and T-T belonging to M, to enter the said construction site; (b) was defective; and (c) was placed on the front line of the said RR vehicle; and (d) obstructed vehicles from proceeding.

On December 26, 2011, at around 09:20 on the construction site for civil-military complex tourism complex in Seopopo-si, Seopo-si, Seopo-si, Seopo-si, Seopo-si, Seopo-si, the construction site for the second construction site for the second construction site for the second construction site for the second construction site for the second construction site for the second construction site for the Jungpo-si, Seopo-si, Seopo-si, a construction director of U.S., is carrying out the work for the transportation of ready-mixed snow and stone, and the first construction site for the first construction.