beta
(영문) 전주지방법원 군산지원 2017.04.21 2017고단104

업무상과실치사등

Text

A defendant shall be punished by imprisonment for not less than eight months.

However, the execution of the above punishment shall be suspended for a period of one year from the date this judgment becomes final and conclusive.

Reasons

Punishment of the crime

The defendant is the representative of the Kim Chang-C, located in the Gunsan-si, in charge of safety and health management for his employees.

From November 17, 2016, the Defendant: (a) from around 15:40 on November 17, 2016, around 15:40, 15:40, the Defendant: (b) had four workers wear the cream vessel (1.9 tons) at the rith line of the Sinsan City (10 tons); (c) had four workers prepare the hull and engine repair; (d) one side, which is a heavy object, installed the string of the said vessel; and (e) had the string of the string at a height of 65 cm (the body that leaves the water by fixing the water, etc.), and (e) maintained the strhythm on the part of a small vessel at a height of 155 cm.

At the time, victims D were engaged in the work of carrying and handling a vessel, which is heavy objects, as above, in order to install an additional strhyth of sphere for support. In the work of transporting and handling heavy objects, there is a risk of accidents to workers by moving the vessel in the process of the work, due to the external power or weight-centered movement of the vessel. Thus, the defendant, the business owner, including safety measures to prevent risks, such as fall, fall, fall, fall, electric power, rapid landing, collapse, etc., shall conduct a prior investigation on the relevant work site, the topography, ground and ground of the work site, the condition, etc. of the relevant work site, after considering the results of the investigation, prepare a work plan including the above matters and have the conductor conduct the work in accordance with the work plan, and ② install a work plan by designating the conductor and have him command the work in accordance with the work plan, and ③ install and handle a vessel with a certain method to ensure that one of the vessels is capable of carrying or signaled by two or more persons.