beta
(영문) 의정부지방법원고양지원 2016.12.16 2015가단29759

군사시설철거 등

Text

1. The defendant is against the plaintiff A, the plaintiff A.

(a) Of “6,393 square meters of C Forest land in Pakistan-si,” the attached appraisal No. 1 is also indicated 87.

Reasons

1. There is no dispute between the parties to the judgment as to the cause of the claim, or taking into account the written evidence Nos. 1 and 2 (including each number; hereinafter the same shall apply) and the result of the commission of surveying and appraisal to the branch offices of the Korea Land Information Corporation in the Republic of Korea in this court, Plaintiff A and Plaintiff A (hereinafter “Plaintiff clan”) are the owners of “6,393 square meters of forest land C in the Yellowju-si” and “1,587 square meters of forest land in the Yellowju-si”; Plaintiff B is the owners of “2,659 square meters of forest land E in the Yellowju-si.” without any title, and the fact that the Defendant occupied the part by installing transportation and training facilities for military training in the above three lots of land without any title.

Therefore, the defendant shall remove the traffic slope table and training room installed in the part "B" in the part "B" installed in the 629 square meters connected with each point of 87 through 9, 129 through 155, and 87, among the "6,393 square meters of forest land and C, Si, Si, Si, Gu," and deliver to the plaintiff of the same clan, < Amended by Presidential Decree No. 12092, Feb. 1, 2007; Presidential Decree No. 12063, Apr. 17, 2007; Presidential Decree No. 11751, Sep. 1, 2007; Presidential Decree No. 17564, Feb. 19, 2007; Presidential Decree No. 17568, Feb. 19, 2007; Presidential Decree No. 17517, Feb. 19, 2007; Presidential Decree No. 17568, Feb. 1, 2007>

In addition, the Defendant removed the traffic slope surface and training ground installed on the part of 277 square meters in the ship that connects each point of the attached Table 160 through 213, 55, 160 square meters among “YY E 2,659 square meters” to the Plaintiff B, and the Defendant removed the traffic slope surface and training ground installed on the 277 square meters in order.