(영문) 서울남부지방법원 2016.11.23 2016고정2254

산업안전보건법위반

Text

Defendants shall be punished by a fine of KRW 80,000.

Defendant

If A does not pay the above fine, 100,000.

Reasons

Punishment of the crime

Defendant

A is the site director of the Gangseo-gu Seoul Metropolitan Government "C Urban Residential Housing Construction Corporation", which is performed by Defendant B, and is a person who manages overall matters concerning safety and health of his employees, and is an act for Defendant B, a business owner.

Defendant

A Co., Ltd. is a corporation established for the purpose of construction business, etc. in Dongjak-gu Seoul Metropolitan Government D and B, and is a corporation that is performed from February 15, 2016 to the date of being awarded a contract for 2,98 million won for the "C Urban Residential Housing Construction Corporation" from E.

With respect to “Supervision at Construction Site in Preparation for the Roof Scrap,” implemented on June 10, 2016.

1. Defendant A:

(a) Safety wires shall be installed by using metal pipes, pipes, or materials with at least 2.7 cent in diameter, in order to prevent the fall, etc. of workers;

Nevertheless, it was not installed using metal pipes with a diameter of not less than 2.7 cents or materials with a strength of not less than 2.7 cent in diameter.

(b) A business owner shall take protective measures, such as safety distresss, fences, vertical fall-off nets, or covers, at a place where the workers might fall down, as the end or opening of the work plate and passage;

Nevertheless, safety problems have not been installed in the 3th 56th slves part of the 56th slives part and external vision judgment part.

(c) When a business owner installs a temporary passage, he/she shall install a safe passage at a place at the risk of fall;

Nevertheless, there is a danger of falling on the road section of each Dong's temporary connection, but there is no safe gap.

Where an object is removed or is in danger of falling off due to work, the business owner shall take measures necessary to prevent any danger, such as the installation, etc. of a falling-water prevention network.

Nevertheless, it is established in each Dong.