(영문) 서울동부지방법원 2016.10.26 2014가합9777

물품대금

Text

1. The plaintiff's rehabilitation debtor, a corporation incorporated in the same family construction industry shall confirm that the rehabilitation claim is 34,250,000 won;

2...

Reasons

Based on the facts, on August 20, 2013, the contract of this case was concluded between the Plaintiff and Dong Construction Industry Co., Ltd. (hereinafter referred to as the "AL-FRM and the internal mold, and hereinafter referred to as the "AL-FRM"; hereinafter referred to as the "alptyp"; hereinafter referred to as the "alpyp") with the condition that the Plaintiff will produce and supply the parts to be used for the dong Construction Industry Co., Ltd. (hereinafter referred to as the "AL") and its accessory materials to be used in the dong-si Apartment Apartment Apartment Apartment Apartment Apartment Apartment apartment Construction Co., Ltd. (hereinafter referred to as the "Dong Construction") where it is necessary to distinguish the above company from the Plaintiff (hereinafter referred to as the "instant contract") and the Plaintiff.

The name of the instant contract is “the purchase contract for materials: the name of the contract: the name of the contract: Dong ducheon APT APM supply; the contract period is from the contract date to June 30, 2014; the total contract amount is KRW 1,362,90,000 (including value-added tax); the quantity is 221,582 square meters; the supply conditions are 221,582 square meters; the delivery conditions are the conditions of on-site arrival (BUY-BACK); the contract amount is paid in cash within 60 days after the completion of delivery; and the contract amount is paid in cash by the Plaintiff in accordance with the inspection protocol prepared by the inspection officer of the rehabilitation company.

The name of the quotation submitted by the Plaintiff to the rehabilitation company prior to the conclusion of the instant contract (hereinafter referred to as the “instant quotation”) is “AL-FOR lease estimate.” From 101 to 107 dong units (31 floor, 492 units) are estimated based on seven dong units (31 floor, 492), and the cost of carrying out transport shall be determined as options items, and the cost of carrying out transport shall be determined as PIN, fac, controlton, reinforcement and pumps, and shall be subject to all return of both PIN, fac, controlton, reinforcement and pumps.