(영문) 광주지방법원 2016.10.05 2014가단518995

손해배상(산)

Text

1. Defendant Otex Korea Co., Ltd.: KRW 69,929,702 and its amount from December 6, 2013 to October 5, 2016.

Reasons

1. Facts of premise;

A. The Plaintiff is the mother of D, and D is an employee employed by the Defendant Special D’s (hereinafter “Defendant Special D’).

B. Defendant Jinsung Special steel is a company that runs the business of processing and selling steel materials, and Defendant Qteex Korea Co., Ltd. (hereinafter “Defendant Qteex Korea”) is a company that runs the business of manufacturing and selling presses.

C. At around 16:30 on October 17, 2013, D, under the direction of the Defendant Jinsung special lecture, loaded and unloaded iron plates (a.e., about 80 cm, about 80 cm, about 80 cm, and about 300 km, about 16:30 cm) on the cargo loaded at the place of business of Defendant Otex Korea.

The loading and unloading work was carried out in a manner that moves steel plates to be loaded on a mathic scrap, and D suffered injury, such as D’s strings, by shocking D’s strings that had been under his/her supervision, after separation of steel plates from the back surface of the above strings, and falling below the lower part of D’s strings that had been under his/her supervision from the back surface of the branch where D’s steel plates were laid down.

(hereinafter referred to as “the primary accident of this case”) D.

D was conducted on October 17, 2013 at the Gwangju E Hospital, on November 26, 2013, on the annual installments removal surgery, and on December 22, 2013, on the loss of the organization in the annual installments.

After that, around December 14:35, 2013, D complained of a temporary pulmonary difficulty to the medical personnel of the above hospital. At the same time, D filed an appeal for the temporary pulmonary disorder with blood pressure of 100/70, beer and beer, 80, and absorbing 20, and the medical personnel stated to the effect that “current is fine.”

E. D had no symptoms of 16:00 and 17:00 respiratory distress on the same day, but at around 20:40 on the same day, D’s own was used in toilets, and blood pressure was reduced to 70/50 on the same day, and it was revealed that the heart problem was found as a result of the cardio-high wave conducted around 20:15 on the same day, and determined to transfer D’s medical personnel to a university hospital, and transferred D’s hospital at around 21:35 on the same day.

D. Do.