(영문) 수원지방법원 2018.09.05 2017가합26693

손해배상(기)

Text

1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. Basic facts

A. On April 1, 2013, the Plaintiff engaged in the business of manufacturing and installing a separation machine of the lower court, which is to extract milk from the amount of food loss, concluded an agreement on the installation and supply of a distribution separation device (hereinafter “instant agreement”) with the Defendant, a company engaged in waste disposal facilities and management business, etc., whose main contents are as follows:

3. On the 3th anniversary of the agreement on the installation and supply of the separation device using the separation machine in the original trial, the agreement on the installation and operation of the separation machine in the original trial on the third third instance is concluded between the parties to the agreement on the installation and operation of the separation machine in the original trial (hereinafter referred to as the "supplier") and the party to the agreement on the installation and operation of the separation machine in the original trial (hereinafter referred to as the "supplier") (hereinafter referred to as the "supplier") which supplies the site for the threerd instance for the purpose of improving water quality.

- Article 1 (Implementation Projects and Places of Business)

1. Name of a promotion project: A project to extract fluids and improve the quality of food wastes, using the amount of away food wastes;

2. Quantities: 150 tons per day and weekly standards for 900 tons;

3. Amount to be installed: Article 3 separate from 350,000,000 won, and the surtax;

1. A facility that “installer” as referred to in Article 2 (i) is to be installed shall be located at the factory of “supplier” and set up in “supplier”. (ii) Within three months after the installation of this facility, a process manual and instrument operation shall be installed so as to prevent operational problems by improving the process problems.

3) During the process, the costs of fuel and electricity shall be borne by the static facilities. 4) The ownership of this facility is owned by the “installer”.

5) In principle, once a month must be inspected to ensure that there is no problem in the process. 6) The part concerning the operation of care due to the operation of process shall be accurately indicated by item.

7) The disposal capacity of this facility shall be 10 cubic meters/h, and the disposal capacity shall be 10 cubic meters/h, in principle, immediately in the event that it does not have a performance guarantee. 8) The disposal capacity shall be as agreed upon.