(영문) 광주지방법원 2018.01.25 2017고단3978

사기

Text

A defendant shall be punished by imprisonment for four months.

However, the execution of the above sentence shall be suspended for a period of one year from the date this judgment becomes final and conclusive.

Reasons

Punishment of the crime

It was revised and supplemented ex officio as evidence to the extent that it does not interfere with the defendant's right of defense.

On September 21, 2016, the Defendant is a director in charge of facility management of C, and at the C's office located in Gwangju Mine-gu around 10:30 on September 21, 2016, the Defendant is required to repair the former fire-fighting dog in order to initiate the business of the G care hospital.

When the Corporation completes, it is possible to immediately start its business after receiving a certificate of regular inspection from the Korea Electric Safety Corporation.

The construction cost will be paid on the completion of the repair and fire-fighting construction works.

“.....”

However, on August 16, 2016, the Defendant did not notify the victim of the fact that C received a preservative measure order from the above court on August 22, 2016, by simultaneously filing an application for rehabilitation procedure commencement with the Gwangju District Court for preservative measure and comprehensive injunction order on the foundation’s property, and on August 22, 2016, the Defendant did not notify the victim of the fact that C received a preservative measure order from the above court. Since the said foundation could not pay the victim the cost without the permission of the court, even if the victim’s electrical fire-fighting repair repair was completed and the inspection confirmation certificate was

Nevertheless, the Defendant: (a) by deceiving the victim as above; (b) concluded a contract with the medical corporation C, the contractor C, the contractor C, the construction price of KRW 53,00,000; and (c) on September 21, 2016, the date of the commencement of the construction; and (b) concluded an additional contract with the medical corporation C, the contractor (owner), the contractor (owner), the construction price of KRW 5,830,00, and the date of the commencement of the construction, on September 26, 2016.

After October 24, 2016, the victim completed the aforementioned repair and fire-fighting construction works, and issued a certificate of regular inspection by the Korea Electric Safety Corporation, the total construction cost shall be 58,830.