beta
(영문) 부산지방법원 2018.10.17 2017가합45328

공사대금

Text

1. The Defendant’s KRW 378,551,668 as well as the Plaintiff’s annual rate from June 6, 2017 to October 17, 2018, and the following.

Reasons

Basic Facts

The defendant was to newly build the ten-story neighborhood living facilities with the 10th ground level above the ground level on the land outside Busan Jung-gu and 1.

(2) On February 1, 2015, the Defendant concluded a contract with D Co., Ltd. (hereinafter “D”) to set the contract amount as KRW 410,00,000 (including value-added tax) for the construction of the instant building with D Co., Ltd. (hereinafter “D”).

(hereinafter “instant contract for the Civil Works”). On February 21, 2015, the Defendant entered into a contract for the following works with respect to E Co., Ltd. and the instant building construction works except civil engineering works:

1. Name of the construction work: Construction work of Busan Fdong Commercial Building;

3. Construction period: The contract amount on February 9, 2016, as of March 9, 2015: 2,299,000,000 won (including value-added tax) for delay: 1/1,000 Defendant entered into a contract for the following matters with respect to the remainder of the construction works other than civil engineering works among the new construction works of the Plaintiff, D and the instant building on November 4, 2015:

(hereinafter “instant primary contract”). 1. Construction name: Construction of a new G building

3. Date of commencement: The date of completion on April 4, 2015: May 31, 2016: 2,299,000,000 won (including value-added tax) (including a special engineer) (including value-added tax).

1. This Agreement is the drawings of the construction permit and is an additional contract at the time of its modification.

2. Recognizing the portion of work D with respect to the work progress up to now.

3. The amount paid separately for the lease (the deposit for electric works, the expenses for inspection of electric works, and the expenses for the entry of waterworks);

4. Exclusion from heating and cooling works.

5. Exclusion from gas works.

6. Electric power plant including electric power plant;

7. The inclusion of charges borne by sewage septic tanks;

8. On November 18, 2015, separate Plaintiffs, Defendant, and D agreed to:

A: Defendant D: Plaintiff A, B, and C agree to a transaction agreement in entering into a contract for the new construction of one parcel of land outside Busan Jung-gu, and one parcel of land (the 10th floor above the ground level).

1.