자동차손해배상보장법위반등
A defendant shall be punished by imprisonment for not less than eight months.
However, the execution of the above punishment shall be suspended for a period of two years from the date this judgment becomes final and conclusive.
Punishment of the crime
On November 8, 2013, the Defendant was sentenced to a fine of three million won for a violation of road traffic law (unlicensed driving) in order to support the High Government District Court of Jung-gu on November 8, 2013, and has a total of five-timeless driving criminal records and four-timeless driving criminal records.
"2015 Highest 1959"
1. On August 3, 2015, the Defendant violated the Road Traffic Act (unlicensed driving) driving a C-wing truck at approximately 5km from the front of the Goyang-gu Do-dong Do-dong Do-dong, Seoyang-gu to the front of the 5km-dong Do-dong Do-dong Do-dong Do-dong to the front of the 5-dong Do-dong Do-dong Do-dong Do-dong.
2. The Defendant in violation of the Guarantee of Automobile Compensation Act is a holder of C-wing and freight truck.
No automobile which is not covered by mandatory insurance shall be operated on a road.
Nevertheless, the defendant operated the freight truck which was not covered by mandatory insurance at the time and place above.
"2015 Highest 2085"
1. Around 15:30 on December 13, 2014, the Defendant, without a driver’s license, driven a DF rocketing car from the 5km section to the front road of the Ganyang-gu Do-dong Do-dong Do-dong Do-dong Do-dong Do-dong Do-dong Do-dong Do-dong Do-dong Do-dong Do-dong Do-dong Do-dong.
2. No motor vehicle which is not covered by mandatory insurance in violation of the Guarantee of Automobile Accident Compensation Insurance shall be operated on a road;
Nevertheless, the defendant operated the above EF rocketing car quantity, which was not covered by mandatory insurance at the same time and at the same place as the above 1.1.
"2015 Highest 2610"
1. On April 24, 2013, the Defendant of the crime committed around April 24, 2013 used 100 metal cutting 10 percent in metal cutting ordered by the G company H representative at the site of the construction work located in the Nam-si, Nam-gu, Gyeonggi-si, and the victim E to supply 20 tin of metal cutting to the victim E. The proceeds will be deposited without the mold by the last day, and the proceeds will be deposited without the mold, together with the number of metal cutting ordered by the H representative at the site.