(영문) 서울서부지방법원 2017.04.28 2017가단2109
건물명도
Text
1. The Plaintiff:
A. Defendant B is marked 1, 2, 3, 4, 1 of the attached Form 1 drawings among the land floors of the building listed in the attached Table 1 list.
Reasons
1. Indication of claims: To be as specified in attached Form 1;
2. Grounds for recognition: Article 208 (3) 2 of the Civil Procedure Act, the main sentence of Article 150 (3) and Article 150 (1) of the same Act.