1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. The fact that the Plaintiff, on January 17, 2012, purchased C Apartment 212 and 902 (hereinafter “instant apartment”) constructed by the Defendant from the “B Housing Redevelopment and Improvement Project Association” (hereinafter “B Housing Redevelopment and Improvement Project Association”) is not a dispute between the parties, or can be recognized by comprehensively taking into account the overall purport of the pleadings as indicated in the evidence No. 1 (as shown in the evidence No. 4).

2. The Plaintiff’s assertion does not have a model house of the instant apartment, which is a type A with a 59.96 square meters in the C Apartment Model House, but the interior of the instant apartment is the same as A-type with a 84.90 square meters of the instant apartment.

"A" has been explained and confirmed the model housing of A-type apartment of 84.90 square meters and entered into a sales contract on the apartment of this case after confirming the model housing.

However, the Defendant constructed the interior of the apartment of this case differently from the A-type of 84.90 square meters.

In addition, the apartment of this case was designed to ensure that the area of the balcony was 12.17 square meters and the length was 3,800 meters in the balcony as soon as possible in the balcony. However, as the design of the apartment of this case was modified to reduce the size of the balcony by 9.37 square meters and the length was 1,980 meters in the middle of the balcony to 1,980 meters, and the apartment of this case was installed to close the balcony to the balcony, so the defendant was not able to close the balcony, so that it is necessary to make it close to the balcony, despite the fact that it is necessary to make it possible for the defendant to open the balcony to the living room.

In addition, the defendant should make the outside support stand of the public bath room to go up to 7 cm from the end of the upper bath, but rather 1.5 cm.

In addition, in the apartment of this case constructed by the defendant, gold is set off on the wall of the boiler room, the scams of the bedrooms and the living room are laid down, and the MaF stick out out at a certain distance of not less than 1m, the scam of the scam at a certain distance of not less than 1m, the shape of the fire-resistant machine is different from the angle, and the shape of the couple’s bathing room is different.