기계대금
1. The Defendant’s KRW 141,886,568 for the Plaintiff and KRW 6% per annum from November 8, 2013 to October 31, 2014.
1. Determination as to the cause of claim
A. Fact 1) The Plaintiff is a company that manufactures and sells industrial machinery. The Defendant is a person who runs pipeline materials and trade business, etc. in the name of B. (2) The Plaintiff and the Defendant concluded a contract under which the Plaintiff would manufacture and supply the machinery parts (hereinafter “instant contract”) to the Defendant, and the Plaintiff supplied the machinery parts (hereinafter “each of the instant machinery parts”) to the Defendant from December 5, 201 to July 2, 2012 under the instant contract.
순번 발주일 내역 금액(부가세별도) 1 2011. 12. 5. 위치결정 TABLE 10,318,057원 2 2012. 1. 3. 가와사키 3종세트 14,155,688원 3 FRAME 70,000,000원 4 2012. 3. 9. DAMPER(OTTO) 3,000,000원 5 MIXING TANK 4,800,000원 6 2CB ROLLER(JFE) 22,000,000원 7 LEVER(JFE) 8,000,000원 8 북해제철/무로란 45,225,000원 9 CHUTE(JFE) 109,500,000원 10 2012. 5. 22. 스미킨 33,000,000원 11 GEAR BOX(OTTO) 22,261,500원 12 中田SQ STAND 32,400,000원 13 JFE Support Frame 1220J94600 2,010,000원 14 JEF Descaling Head 1220J93800 1,520,000원 15 MIZUSHIMA Curtain Drum 2,635,000원 16 IMEX8" EDGE MILLER 25,650,000원 17 2012. 6. 14 OBS,OBW부품 23,060,000원 18 CASING 80,000,000원 19 MCC No,2B Cokes Renewal 173,410,000원 20 2012. 7. 2. GEAR BOX(OTTO)추가금액 1,850,200원 21 북해제철/무로란 추가금액1 8,571,894원 22 북해제철/무로란 추가금액2 2,142,974원 23 틸팅테이블 후레임 가이드 40,000,000원 24 드라이어 28,000,000원 25 2012. 7. 23. MCC추가 및 BOLT류 11,650,000원 합 계 775,160,313원 3 피고는 원고에게 ① 2012. 2. 11. 24,473,745원, ② 같은 해
3. The same year: 16.70,000,000 won
4. 29,800,000 won for the same year.
6. 24,00,000 won on November 24, 199; and
6. 20. 95,000,000 won, and 6. The same year
8. 100,000,000 won, and 7. The same year.
9. 27. 22. 100,000,000 won and 8. 27. 27. and 28. 150,000,000 won for the 27. 27. and 28. 28. 30. 30. 30. 40,000,000 won.