beta
(영문) 서울고등법원 2018.08.17 2018누36150

시정명령등취소

Text

1. All of the plaintiff's claims are dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. Details of the disposition;

A. The status of the Plaintiff, etc. 1) Plaintiff, Newyang Construction Co., Ltd., Mayang C&C Co., Ltd., Majin C&C Co., Ltd., Cheongjin Construction Co., Ltd., Cheongjin Construction Co., Ltd., Pacific Construction Co., Ltd., Ltd., ASEAN Construction Co., Ltd., Ltd., Haak Construction Co., Ltd., Taewon Construction Co., Ltd., Taewon Construction Co., Ltd., Taewon Construction Co., Ltd., Ltd., Central Co., Ltd., Hasan Engineering Co.,

The Monopoly Regulation and Fair Trade Act (hereinafter referred to as the “Fair Trade Act”) is a business owner engaged in painting construction business, unclaimed, waterproof and cooking construction business, or facility maintenance and management business.

(2) The general status of the Plaintiff, etc. is indicated in the table below.

(해당년도 말 기준, 단위: 백만 원, 명) 연도 자산총계 자본총계 매출액 영업이익 당기 순이익 상시 종업원 설립일자 1 원고 2016 4,352 3,615 10,579 143 203 19 1991. 5. 28. 2015 4,061 3,410 11,478 36 229 24 2014 4,032 3,370 10,243 246 319 21 2 신양아이엔지건설 2016 7,098 5,814 10,722 343 327 21 1982. 12. 27. 2015 6,253 4,985 11,337 366 328 22 2014 5,316 4,684 12,270 518 426 21 3 부영씨엔씨 2016 11,492 10,083 28,824 2,796 2,098 49 1998. 10. 20. 2015 11,953 9,559 32,170 3,447 2,861 46 2014 8,485 6,732 28,988 2,837 2,750 40 4 세진씨엔씨 2016 3,918 3,027 11,062 276 235 23 1994. 9. 9. 2015 3,776 3,043 15,740 730 603 19 2014 3,398 2,921 12,087 476 375 22 5 석진건설 2016 5,897 4,658 14,806 228 192 27 1979. 8. 25. 2015 6,092 4,696 20,571 716 584 27 2014 7,165 5,786 19,978 816 726 27 6 적산건설 2016 3,618 3,299 9,685 80 31 22 1991. 1. 17. 2015 4,124 3,267 11,699 371 323 19 2014 3,599 2,945 11,876 290 226 15 7 아우리 2016 3,766 3,162 8,431 396 332 12 2003. 11. 7. 2015 3,559 2,830 8,906 469 414 11 2014 3,041 2,416 8,232 463 411 13 8 신화건설 2016 4,276 3,578 24,425 109 26 19 1997. 9. 3...