(영문) 의정부지방법원 고양지원 2017.03.23 2015가단79822

보험금

Text

1. The defendant shall pay 34,350,000 won to the plaintiff and 15% per annum from June 23, 2015 to the day of complete payment.

Reasons

1. Facts recognized;

A. On September 2012, a contracting company and the Korea-U.S.A., concluded a contract for the production and installation of the facilities that make it possible for the winners of the paper sealed in B U.S. head office and BOx Cuta tape to open easily the paper tape (hereinafter “instant facilities”). The Korea-U.S., a contracting company and the Korea-U.S., a contracting company entered into a contract for the manufacture and installation of the facilities that make it possible for them to easily open the paper tape, etc. (hereinafter “instant facilities”). The Korea-U.S., a contracting company and the Korea-U.S., a contracting company entered into the Korea-U.S., the Korea-U.S., a contracting company

On October 11, 2013, the Plaintiff entered into a contract for the manufacture and installation of the instant facilities (hereinafter “instant contract”) with the Intervenor joining the Defendant (hereinafter “ Intervenor”), and the main contents thereof are as follows.

Article 2 (Contents of Contract: Installation of the Equipment in this case except for the robot system, Article 3 (Total Amount of Contract): Article 4 (Attachment 35 million won): Article 6 (Method and Time of Non-payment: 30%) Contract Deposit (30%) on December 10, 2013: Advance Payment; (2) Payment after the submission of contract deposit; (30%) Installment Payment (60%) after the submission of contract deposit; (3) Balance (10%) after the receipt of contract deposit from A from A’s customer company (referring to the plaintiff) (10%) after the receipt of contract: At the time of the completion of the trial operation (report FAT) from A’s customer company; and (7) at the time of receipt of the remainder from A: At the time of the contract’s customer company, A shall, in principle, enter into a guarantee contract with A to secure the remainder of contract deposit (10%) and then transfer A’s deposit to A’s customer company after completion of the contract.

§ 9. (Ownership) This is being made in a factory of B after the down payment.