beta
(영문) 대구지방법원서부지원 2016.02.04 2014가단13833

건물인도

Text

1. The Defendants jointly receive KRW 125,826,893 from the Plaintiff and jointly do so to the Plaintiff:

(a) annex 1.

Reasons

1. On June 12, 2009, as to each real estate listed in the separate sheet of real estate (hereinafter referred to as “each of the instant real estate”) owned by Defendant A Co., Ltd. (hereinafter referred to as “C”), the Bank of Korea filed an application for voluntary auction with respect to each of the instant real estate (hereinafter referred to as “each of the instant real estate”), and the Plaintiff acquired ownership after receiving a successful bid for each of the instant real estate on December 11, 2009 by the Daegu District Court D.

At the time of auction, in addition to each real estate of this case, the object of auction includes not only the real estate of this case but also the 225.6 square meters in a steel pipe panel and a single-story, a steel pipe panel and a single-story factory, a 84 square meters in a steel pipe panel and a single-story factory, a steel pipe pipe panel and a single-story factory, a 154 square meters in a single-story factory, a steel pipe pipe panel and a single-story, a multi-use room of a board panel and a toilet 12 square meters in a toilet (a total of 511.6 square meters in non-city and non-city buildings (a total of 84 square meters in 25.6 square meters in 25.6 square meters in 154 square meters in 36 square meters in 25.6 square meters in 20

(At present, real estate listed in paragraph (2) of the attached list of real estate and buildings other than the present real estate are connected to each other, and all the connected buildings were combined, and thereafter, the defendant A and the plaintiff agreed on the issue of acquiring each of the instant real estate from the plaintiff. At that time, in relation to each of the instant real estate, the defendant A actually paid or directly paid KRW 125,826,893 in total to the plaintiff for a certain period of time, such as interest on loans to the money loaned by the plaintiff as security for each of the instant real estate, sales price of the instant real estate, property tax, resident tax, expenses for building construction, etc.

The defendant A secured each of the real estate of this case, "as the plaintiff was awarded a successful bid for each of the real estate of this case between the plaintiff and the plaintiff on March 12, 2010, the plaintiff was awarded a successful bid for the real estate of this case by the Seogu District Court Branch of the Daegu District Court 2012Gahap1727."