공사대금
1. The Defendant’s KRW 1,804,041 as well as 6% per annum from July 15, 2011 to January 24, 2014 to the Plaintiff.
1. Basic facts
A. On July 29, 2009, the Plaintiff entered into a construction contract (hereinafter “instant construction contract”) with the Defendant, stipulating that the transmission line construction work (hereinafter “instant construction work”) from among the construction works for the Haak-gu Haak-Haak-Jak Pak Pak Pak-gu Haak Pak Pak-gu Haak Pak Pak-gu, 1,424,50,000 won for the construction cost (including value-added tax) and that the construction period from July 22, 2009 to May 31, 2010 to be awarded a subcontract for the construction work (hereinafter “instant construction contract”).
(B) On September 16, 2010, between the Plaintiff and the Defendant, the contract modification agreement was made between July 22, 2009 and January 31, 2013.
The Plaintiff suspended the instant construction work from September 2009 to April 201, while continuing the instant construction work from around September 201.
[Reasons for Recognition] Unsatisfy, Gap evidence 1-2, Eul evidence 1 (including branch numbers; hereinafter the same shall apply), the purport of whole pleadings
2. The parties' assertion
A. The Plaintiff’s assertion 1) concluded the instant construction contract with the Defendant on July 29, 2009 and carried out the instant construction work. The Defendant did not timely pay the Plaintiff the cost of the instant construction work. Ultimately, around April 29, 201, the Plaintiff suspended the construction work at a high rate of 94.1% during the instant construction work and went away from the construction site at the instant construction site. 2) The amount of the progress portion of the instant construction work until the time the Plaintiff ceased the construction as above until the time when the Plaintiff ceased the construction work (including the value-added tax) includes the amount of KRW 925,295,570 during the instant construction project x KRW 983,310,914 (including value-added tax) x KRW 94.1% during the instant construction project x KRW 194.1% during the period of quality and value-added tax on the design drawings and specifications supplied to the Plaintiff, and the Defendant included the amount of the instant construction work in the construction cost to be increased (excluding KRW 193636,14.3636.