(영문) 부산지방법원 2019.07.26 2019구합20687

당선자결정무효등청구의소

Text

1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

Details of the disposition

The Defendant, after the lapse of about 50 years from the end of the B-gu office building in Busan Metropolitan City, would promote the construction of the applicant company in B-gu, and would establish a basic plan to promote the construction of the applicant company in B-gu around August 2016. On December 2, 2017, the Defendant completed the establishment of a basic plan for B-gu office building with the total floor area of 28,800 square meters in size on the B-Gu office building in Busan Metropolitan City (hereinafter “instant site”) on December 2, 2017 through the Advisory Council on Cultural Heritage on December 1, 2016 and on December 2, 2017.

G located in Busan F (attached Form 1 (D) (hereinafter referred to as the "Standards for Change of Prize Contest") was designated as HH designated in Busan Metropolitan City, I, Busan J (attached Form 1 (hereinafter referred to as the "Standards for Change of Prize Contest") on October 5, 201, and K located in Mro-ro, Busan Metropolitan City and Busan NN (attached Form 1 (hereinafter referred to as the "Standards for Change of Prize Contest") on May 13, 2015, K was designated as a commemorative P (hereinafter referred to as the "instant cultural heritage"). Accordingly, the surrounding cultural heritage area of this case is designated as a cultural heritage area and a historic and cultural environment preservation area, such as the attached Table 1 "Standards for Change of Prize Contest".

The permissible standards for construction activities within the G and K historical and cultural environment preservation area shall be as specified in the following table:

It is necessary to maintain the maximum height of two zones, the maximum height of which is not more than 12m and not more than 14m, the height of not more than 18m, the height of not more than 18m, the height of not more than 14m, the height of not more than 18m located in Busan Q high-gun, not more than 18m in accordance with the relevant Acts and subordinate statutes, such as the Urban Planning Ordinance of Zone 5 Busan Metropolitan City, etc., to allow reconstruction and reconstruction of existing buildings and facilities within the zones of 1 to 4m common matters to be handled in accordance with the relevant Acts and subordinate statutes, such as the Urban Planning Ordinance of Zone 5, Busan Metropolitan City, etc.

b.O.