소유권확인
1. The plaintiff's primary claim against the defendant B, which was changed in exchange at the trial, and the defendant added at the trial.
1. Facts of recognition;
A. The instant building is constructed on the ground D and E in Southyang-si.
B. On the ground such as F, G, H, D, E, etc., 16 buildings were built, including the instant building. However, on the building ledger, 12 buildings, including the instant building, among the said 16 buildings were included in the building ledger as a building constructed on the F-ground at the south-ju city.
[Attachment 7, 8, and 100 square meters in the building register are not respectively constructed as a separate building, and the above 12 buildings were constructed as a single building. According to the evidence Nos. 7, 8, and 500 square meters in the building register and the copy of the register No. 1, the building register and the copy of the register No. 35.96 square meters in the building register and the copy of the register No. 35.96 square meters in the building register. However, according to the witness’s testimony and arguments of the first instance court, according to the purport of the witness’s testimony and arguments of the witness of the first instance trial, it can be recognized that the building listed in paragraph (4) of the attached Table No. 4 was recorded in the above building register, and there is no building with a 30.96 square meters in the area of the above real estate separately from the building listed in paragraph (4) of the attached Table No. 4.
At the time of August 9, 1995, I, Seongdongsan, and J agreed to change the lot number in the building ledger to the contents identical to F, G, H, D, and E in Nam-si, Nam-si, the actual status of which is the actual status (in the case of the building of this case, the agreement was made to change to D and E in the case of the building of this case), and on October 13, 1999, the lot number of the building register of the building of the above 12 buildings recorded in the previous building ledger was corrected in the process of correction. Since D and E were omitted in the process of correction, the lot number of the above 12 buildings was changed to F, G, K, H, H, and L, and L were corrected to M.