대여금
1. All of the plaintiff's claims are dismissed.
2. The costs of lawsuit shall be borne by the Plaintiff.
. Having borrowed KRW 200,000,000 and drawn up a certificate of borrowing that the repayment shall be made not later than April 30, 2013 and the interest shall be 1% per annum;
2) On May 23, 2014, Defendant B: (a) borrowed KRW 300,000,000 from the Plaintiff; and (b) drafted a loan certificate to repay by June 30, 2014; (c) Defendant B drafted a loan certificate with the following content on July 2, 2014.
Under the above loan certificate, “B” is written in “B”, and the seal impression of Defendant B is affixed next to it, and the “B” column is written in “C”, and the seal impression of Defendant C was affixed next to it.
The above loan certificate was accompanied by the defendants' certificate of personal seal impression issued on July 2, 2014 by the agent I.
The Plaintiff and Defendant B, with respect to the J business, shall borrow as follows:
The following:
1. Cumulative borrowed amount: 【1,200,000,000 won per day: the daily gold nex nex nex nex nex nex nex nex nex nex nex nex nex 600,000,000 (before June 30, 2014): The daily gold nex nex nex 600,000,000 nex nex nex nex nex nex nex nex nex nex nex nex nex nex nex nex,000 nex nex nex n
2. Date of return: June 30, 2015.
3. Interest rate: 1% per month;
4. Date of remittance: Consultation and coordination.
5. A special engineer: (a) if, in principle, repayment should be made prior to the date of return by aggregating principal and interest (on June 30, 2015), or if the date of return (on June 30, 2015), the Defendant B shall transfer the commercial buildings located within the K site equivalent to the sum of 00 billion won and interest, or (b) the commercial buildings located within the K site or the land acquired by L from Gangwon-do to the Plaintiff as its acquisition cost, and the choice of buildings or land shall be decided by the Plaintiff
4 On September 30, 2014, Defendant B prepared a certificate of loan stating “1% per month” in the column for “amount borrowed” as “200,000,000 won and “date of return” from the Plaintiff and “date of return” as “the same loan certificate as that of July 2, 2014” and “interest rate” column.
On July 2, 2014, the above loan certificate is issued by the agent I.