1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. Basic facts

A. The title of the patented invention (A) invention of this case: (2) filing date/registration date/registration date/registration number of the water cleaners: February 22, 2004; (3) February 20, 2007 / Patent No. 687287 (3) of the Patent Act: the outline of the plaintiff's (4): (1) The plaintiff's technical field: the plaintiff's summary of the invention. (1) The plaintiff's art division of the launchs exposed to the upper upper upper upper upper upper upper upper upper upper upper upper upper upper upper upper upper upper upper upper upper upper upper lower portion of the water cleaners; and (2) the plaintiff's operation method of the first and second outer parts installed before and after the lower lower lower lower lower lower lower portion, so that the water walk can be easily removed, and the plaintiff's cleaning is made more smooth and safe action by improving the composition of the operation department to operate at the same time.

(2) In the past, there is a problem that each composition of the operating unit of the water boomr has frequently been damaged due to the inherent problems in its association and operation, and there is a problem that the structure of the operating unit of the water boomr could be easily damaged by an unreasonable association between each composition.

(3) The task to be solved is to provide a water level cleaningr so that more smooth and safe action can be performed by improving the operating relationship between the first and second side of the water level 1 and the non-permanent absence to remove the water level .

(4) The original copy (70) of the board (200) as mentioned above (2) has been cancelled under the separation of the water cover of the water cover of the water cover cleaning method of the task solving method, and the above original copy (40a, 40b) and the first, second, and second, half of the non-permanent absence (50a, 50b) have been separated, while the above slot absence (100) has been brought back by the pressure of the shot (300).

At this time, the line before and after being adhered to the floor of the sub-committee (10) with the above sub-committee (40a, 40b) and the first, second, non-permanent absence (50a, 50b) (50a, 50b).

In addition, if a board (200) exposed to the opening of the upper sub-committee (20) is accumulated in upper corners (210), it shall be centered on the revolving axis.