beta
(영문) 부산지방법원 2017.06.20 2017가단11922

건물명도등

Text

1. The defendant shall be the plaintiff.

(a) 4 floors of the Busan East-gu C internal manufacture schedule 88-918, the slive roof of reinforced concrete structure 4.

Reasons

1. The cause of the claim is as shown in the annexed sheet;

2. Full acceptance of the claim for conclusion (a judgment without pleading: Articles 208(3)1 and 257 of the Civil Procedure Act);