(영문) 수원지방법원안산지원 2017.11.09 2016가합1639

건물명도

Text

1. The Plaintiff:

A. Defendant B delivers each real estate listed in the separate sheet No. 1. and b.

Reasons

1. Indication of claim;

A. On September 14, 2009, the Plaintiff obtained authorization for the establishment of a housing redevelopment project from the Si interest market on September 14, 2009, obtained authorization for the implementation plan on October 8, 2015, obtained authorization for the management and disposal plan on February 18, 2016, and announced the above management and disposal plan on the same day.

B. The land where each of the real estate listed in the separate sheet owned by the Defendants is located is included in the rearrangement zone for the rearrangement project implemented by the Plaintiff.

C. Defendant B connects (B) the part of the ship (A) with the size of 388.6m2 in the business site of the lightweight frame 2,2,3,4, and 1 attached Table 3 list with each point described in attached Table 1, 2, 3, 4, and 1 each point described in attached Table 3 list, in sequence, with each point described in attached Table 5, 6, 7, 8, 9, and 5 of the same drawings; (b) the part (B) of the ship connected with 25.38m2 in order of 25.38m2, such drawings; (c) the part (C) the 70m2, 60m2, 13, 14, 15, and 5m2 with each point described in attached Table 2; and (d) the part (5m2, 96m2, 900m2, 600m2, 16m2,000.

Defendant C leases and occupies part (C) of 44.12 square meters in a ship which connects each point of the attached Form No. 5, 6, 7, 8, and 5 among the real property listed in the attached Table No. 4 list in sequence.

E. Defendant D and E are built of reinforced concrete (A) parts on a ship which connects each point in the attached Form 1, 2, 3, 4, and 1 among the real estate listed in the attached Table 5 list in sequence.